A whole-home renovation feels like one huge problem
When the whole house needs work, it's hard to know where to start, and easy to spend money in the wrong order. New flooring over a wet subfloor or fresh paint under a roof leak is money you spend twice. This planner walks you through the home, sorts every issue by priority, and puts the work in an order that protects your money: water, structure, systems, big upgrades, then finishes. You end up with a short list of what comes first and a plan for the rest.
Who it's for
New homeowners with a fixer-upper or an older house
Anyone planning several projects over the next year
DIYers who want to know what to tackle and what to hire out
Families saving up for renovations one project at a time
What you'll be able to do
Turn a long list into a plan you can follow
Know what to fix firstWalk the whole home and sort every issue into Fix Now, Fix Soon, Plan, or Want.
Plan each roomRoom guides cover common problems, and a room sheet holds measurements, tasks, and selections.
Plan each project before you spendScope, tasks, DIY or hire out, budget, materials, and timeline in one packet.
Spread the work across a yearA 12-month plan, monthly and weekly pages, and material lead times.
Save for the next projectSet a savings target and track it month by month.
Keep your records togetherQuotes, expenses, permits, warranties, and a punch list in one binder.
Assess the homeFill in the home profile and walk the house with the walkthrough pages, starting outside and at the foundation, then systems, then inside.
Sort your prioritiesMove each finding into Fix Now, Fix Soon, Plan, or Want, and choose your first one to three projects.
Plan and price the first projectUse a project packet for scope, tasks, materials, and budget, and compare contractor quotes.
Put it on the calendarMap your projects across the year in the right order and save for the next one.
Delivery
How you get it
This is a digital download. After checkout you get your download link right away and by email. Print the pages you need at home or at a print shop. Repeat pages are marked to print one per room or one per project. Nothing ships.
For personal use. See the license and refund policy. This planner is for organizing and budgeting. It is not an inspection, engineering opinion, or repair manual. Get qualified help for structural, electrical, plumbing, gas, and other safety-related work, and check your local permit rules.
Questions
Frequently asked
Can I fill it in on my computer?
No. It's a printable PDF made to fill in by hand. Print the whole binder or only the pages you need.
Do I need to print all 88 pages?
No. Start with the section that answers the question in front of you. Some pages are printed once, and room and project pages are printed as many times as you need.
I own a mobile or manufactured home. Is this the right planner?
This one is written for site-built homes. The Mobile Home Renovation Planner covers mobile and manufactured homes.
Does it include a budget spreadsheet?
No. Each project has a paper budget page and there's an expense log. The Home Renovation Cost Calculator does the math in Excel or Google Sheets, and the bundle includes both.
Will it tell me how to do the repairs?
No. It helps you decide what to do, in what order, and what it will cost. The reference guide covers what to check and when to stop and get help.
How do I get the files?
Right after checkout you get a download link on screen and by email.
Reviews
What customers say
No reviews yet. If you've used this tool, we'd love to hear how it went.